Thorntons Dunboyne

Location: Dunboyne, Co. Meath
Country: Ireland
Project Type: C&D/C&I
Year
0
Type

C&D/C&I

Tonnes per hour

40

Tonnes per Annum
0

The Challenge

Thorntons needed a next-gen facility to handle increasing volumes of co-mingled C&D/C&I while staying ahead of tightening environmental regulations and rising landfill costs.

Key pressures:

· Growing waste volumes with inconsistent material composition

· Need to maximise recovery rates and reduce residuals waste

· Increasing demand for high-purity outputs

· Pressure to automate processes and reduce manual handling

· Requirement for a fast-track build with minimal disruption

The Solution

Core System Highlights:

· Single infeed system (40 tph) for streamlined operations

· Primary shredding

· Double Deck screening for splitting the material to 0-10mm, 10-60mm and +60mm

· Multi-stage magnetic separation to maximise ferrous recovery

· Double drum and single drum separation for precise material classification

· Windshifting technology to isolate light fractions

· Optical sorting systems to refine wood, non-ferrous, and residual streams

· Integrated quality control stations ensuring premium output

The Outcome

High Recovery Performance/Premium Product Delivered

Turmec delivered project  within budget.

Reduced Landfill Dependency

Significant reduction in residual waste through better segregation and recovery.

Future-Ready Facility

Scalable design positions Thorntons to handle evolving waste streams and stricter regulations.