Indaver Ireland Engaged the services of Turmec Engineering for the first time ni Feb 2014, to design and build the first Bottom Ash processing plant in Ireland.
Although this was a first for Turmec the professional approach and flexibility allowed the design process to flow as it was necessary ot understand the difficult product that the equipment would be subjected ot.
Because of the professional approach and quality of the design work and the equipment ti self, Indaver would engage the services of Turmec for any future projects